Application
Add Sump Kleener ( about 1 - 1.5% ) into the sump of CNC machine 1 - 2 days prior to machine cleaning and change of coolants and let the machine run. Drain out the old coolant and refill with new coolant before resuming machine operation.
For Example :
If the CNC sump has 10L of fluid in the machine, add in 0.1L to 0.15 L Sump Kleener into the CNC sump to begin the cleaning process.
Apply Sump Kleener full strength for CNC machine general cleaning. Sump Kleener is safe to clean CNC machines and it will not affect machine coatings and inspection windows.
Down Load Catalogue